Skip to content
Logistics · National logistics operator

A control tower that works when the network does not

Replaced a brittle monolith with an event-driven control tower and an offline-capable field app for drivers and warehouse staff.

The constraint

Live tracking failed in low-connectivity regions, and every new carrier integration took months.

What we did

  1. 01. Split the monolith around shipment, partner, and exception domains
  2. 02. Introduced an event bus and idempotent partner adapters
  3. 03. Shipped an offline-first mobile app with conflict-safe sync
  4. 04. Stood up SRE practices and a 15-minute incident review ritual

Build the next chapter of your product with a team that treats engineering as a craft.

Tell us what you are shipping. We will respond with a clear next step — not a generic brochure.